New Lodge Cottage
The project continues to advance steadily, with vkhp overseeing the structural progress on site. The steel columns and beams for the upper levels have been successfully installed, and the timber floor structure for the first floor has now been completed. This timber floor was carefully constructed and reinforced to meet the design specifications, ensuring both durability and stability.
Work on the roof structure has now begun, with steel beams and columns being erected. The vkhp team is monitoring the installation, to enable works to keep in line with structural requirements.
Comments